PIPING-KNOWLEDGE has useful guide for piping engineers. including piping layout , piping supports , codes and standards, software learning like aveva E3d , Pdms , Caesar II. site contain different piping layout .It also content video animations of valves and oil and gas refining process.site has overal piping engineering guide which is useful for piping engineer.

  Hydrostatic & Pneumatic Procedure Hydrostatic testing is most often preferred over pneumatic testing because of safety consideration...

hydrostatic & Pneumatic Procedure

 

Hydrostatic & Pneumatic Procedure

Hydrostatic testing is most often preferred over pneumatic testing because of safety considerations. Water is the preferred fluid medium for hydrostatic testing. In addition to its relatively incompressible nature, it is also the safest fluid because it is nontoxic and nonflammable and it remains in liquid form down to atmospheric pressure unless heated above the boiling point. Water is readily and economically
available. ASME B31.1, section 137.4.3, specifies water as the test fluid for hydrostatic tests unless otherwise specified. ASME B31.3, section 345.4.1, also specifies water as the test fluid for hydrostatic test unless there is the possibility of freezing or damage from adverse effects of water on the piping or the process for which the piping system is designed. This section provides for other uses of other nontoxic liquids as long as the flash point exceeds 120F (49C). If hydrostatic testing is being considered for a system that was designed for use of a gaseous medium as the process fluid, it must first be determined that the piping system will support the weight of the test liquid or that the piping can be safely supported during the hydrostatic test.



There are some cases where water cannot be employed as a fluid test medium. Traces of water left in the piping may react adversely with the process; for example, in piping for liquid sodium or a cryogenic process. If the test is to be run at temperature conditions which would make freezing likely, antifreeze may be added to the water as long as the antifreeze is not harmful to the piping or the process and the disposal of large amounts of antifreeze is not environmentally unacceptable. If water cannot be employed as the fluid test medium and another liquid is not practical, or if it is not practical to support the weight of a test liquid with piping supports, a pneumatic test may be the next best choice

Checklist for Hydrotest:

● Completed and torqued flanges with no missing bolts or gaskets
All gravity supports installed
Proper pipe routing
Correct valve type and orientation
Vents and drains installed to allow proper filling and draining
● Proper material type verified using color codes or markings, and heat numbers
   recorded if required by the codes
All required piping stress relief, weld examinations, and welding documentation
   completed and acceptable
● Before the test is to be run, make certain, by reviewing the piping against the
   P&ID and valve line-up sheet, that
All equipment not to be tested is disconnected from the test or isolated by closed
   valves or testing blinds
Tagging and lockout of any valves used to isolate the test boundaries is in place
    to protect both the testing personnel and any others who may be on site
All non boundary valves in the test boundary are in the open position
Expansion joints, if any, have required restraints to protect against damage from
   the test pressure
All springs have travel stops to protect against the weight of the test medium
All test equipment is checked and all test connections are tight
   For gas systems, additional gravity supports may be required temporarily to support the weight of the test liquid. Since requirements vary from project to project, the person responsible for the test will need to make a specific checklist of items for each project before testing can begin.


Hydrostatic Testing Preparation

All joints, including welds and flanges, of the portions of the system to be tested are left uninsulated and exposed for examination during the test. Some insulation may be installed on the straight runs or previously tested piping. If the system is to include jacketed piping, the leak tests should be run before any jacketing is installed.

A flow water pump is substituted for the pressurizing water pump during the filling of the piping. The water source should provide clean chloride-free water. The system is filled from the bottom to facilitate the venting of all air in the portion of the piping system under test. For sloped piping systems, filling should be done against the slope. Vents must be located at all high points in the piping and should be open during the filling stage. Once it is determined the system is completely liquid filled the vents may be closed and a pressurizing water pump connected to the system in place of the flow pump. The pressurizing pump must have a capacity greater than the allowable leakage of the system. Leakage at the packing glands of valves and pumps is permissible by the codes and is necessary to preserve the life of the packing. However, if this leakage is so great that the test pressure cannot be controlled by being trapped, there will be a problem in running the test. It is not very practical to turn the pressurizing pump on and off to maintain the pressure close to the required level. One solution is to temporarily tighten all the packings to a greater compression than is normally used during regular operation of the system. It may also be necessary to tighten flanges, screwed connections, and other mechanical or gland-type joints to eliminate leakage.


Test and Examination Pressures

Test pressure
minimum

Test pressure
maximum

Test pressure
hold time

Examination
pressure

Code

Test type

ASME B31.1

Hydrostatic1

1.5 times design

Max allowable test
pressure any component or 90 percent
of yield

10 minutes

Design
pressure

ASME B31.1

Pneumatic

1.2 times design

1.5 times design or
max allowable test
pressure any component

10 minutes

Lower of 100
psig or
design
pressure

ASME B31.1

Initial
service

Normal operating
pressure

Normal operating
pressure

10 minutes or
time to complete leak examination

Normal operating
pressure

ASME B31.3

Hydrostatic

1.5 times
design

Not to exceed yield
stress

Time to complete leak examination
but at least
10 minutes

1.5 times
design

ASME B31.3

Pneumatic

1.1 times design

1.1 times design plus
the lesser of 50 psi
or 10 percent of test
pressure

10 minutes

Design
pressure

ASME B31.3

Initial
service3

Design pressure

Design pressure

Time to complete leak examination

Design
pressure

ASME I

Hydrostatic

1.5 times max
allowable
working
pressure4

Not to exceed 90 per-
cent yield stress

Not specified,
typically 1 hr

Max allow
able working
pressure4

ASME III
Division 1
Subsection NB

Hydrostatic

1.25 times system design
pressure5

Not to exceed stress
limits of design section NB-3226 or
maximum test pressure of any system
component5

10 minutes

Greater of
design pressure or .75
times test
pressure

ASME III
Division 1
Subsection NB

Pneumatic

1.2 times system
design
pressure6

Not to exceed stress
limits of design section NB-3226 or
maximum test pressure of any system
com

10 minutes

Greater of
design pressure or .75
times test
pressure

ASME III
Division 1
Subsection NC

Hydrostatic

1.5 times system
design
pressure

If minimum test pressure exceeded by 6
percent establish
limit by the lower of
analysis of all test
loadings or maxi-
mum test pressure
of any component

10 minutes or
15 minutes
per inch of
design mini-
mum wall
thickness for
pumps and
valves

Greater of
design pressure or .75
times test
pressure

ASME III
Division 1
Subsection NC

Pneumatic

1.25 times system design
pressure

If minimum test pressure exceeded by 6
percent establish
limit by the lower of
analysis of all test
loadings or maxi
mum test pressure
of any component

10 minutes

Greater of
design pressure or .75
times test
pressure

ASME III
Division 1
Subsection ND

Hydrostatic

1.5 times system
design pressure for completed components, 1.25
times system
design pressure for piping systems

If minimum test pressure exceeded by 6
percent establish
limit by the lower of
analysis of all test
loadings or maxi
mum test pressure
of any component

10 minutes

Greater of
design pressure or .75
times test
pressure

ASME III
Division 1
Subsection ND

Pneumatic

1.25 times system design
pressure

If minimum test pressure exceeded by 6
percent establish
limit by the lower of
analysis of all test
loadings or maxi
mum test pressure
of any component

10 minutes

Greater of
design pressure or .75
times test
pressure


                                                                                                                                                              

                                                                                                                                                              


 << READ OTHER INTERESTING POST >>


     PIPING MATERIAL


   

        READ MORE >>




           TYPES OF VALVES






           READ MORE >>





    PUMP PIPING




                   


                    



    

          READ MORE >>





 TYPES OF PUMP



READ POST >>



TYPES OF DISTILLATION  COLUMN

READ POST >>



 PDMS & E3D COMMANDS

      READ POST >>



TYPES OF STORAGE TANK







 
READ POST >>

0 Comments: