PIPING-KNOWLEDGE has useful guide for piping engineers. including piping layout , piping supports , codes and standards, software learning like aveva E3d , Pdms , Caesar II. site contain different piping layout .It also content video animations of valves and oil and gas refining process.site has overal piping engineering guide which is useful for piping engineer.

Cleaning and Flushing Methods MECHANICAL CLEANING METHODS The following is a summary of various mechanical methods used in cleaning piping a...

Cleaning and Flushing Methods

Cleaning and Flushing Methods

MECHANICAL CLEANING METHODS


The following is a summary of various mechanical methods used in cleaning piping and components:


Handwiping
Cloths or rags should be lint-free
Water or solvent is typically used in conjunction with the handwipe cleaning process.


Wire Brushing
Either hand or power driven wire brushing is an effective method of cleaning small sections of piping
Use corrosion resistant brush material on stainless steel components and do not use the same brushes on both stainless and carbon steel 

Tube Cleaning Brushes
Air, water, or electric powered expanding type power brushes that drive air or water through the brush provides a method of power flushing the interior surfaces of piping
The water used to flush the interior surfaces of the piping must be compatible with the piping system cleanliness
Do not use air driven brushes that require lubricated air if the motor air enters the pipe
Do not use tube cleaning brushes through valves, strainers, flow orifices, or other sensitive components
Avoid using tube cleaning brushes through socket welded or short radius fittings Grinding
Grinding wheels and discs used for cleaning should only be vitrified or resinoid bonded aluminum oxide or silicon carbide
Aluminum oxide flapper wheels and buffing discs provide effective mechanical cleaning on exterior surfaces
Rotary files can be used for localized cleaning but should be faced with tungsten or titanium carbide




Shot or Grit Blasting
Blasting is typically performed to the Steel Structures Painting Council (SSPC) standards
Do not blast through sensitive components
Only use iron-free grit for blasting stainless steel surfaces
Sand grit may be used on carbon steel buttwelded piping
Do not blast areas requiring liquid penetrant examinations
For 2 inch and smaller piping, a radial type blast nozzle may be       inserted into the pipe to blast the interior surface


Mechanical cleaning operations are usually followed by hand cleaning of accessible internal surfaces and by air blow or water rinse of inaccessible internal surfaces. Air blowing is preferred after a shot or grit blast.


VACUUM CLEANING

Vacuum cleaning can be used for the removal of metal chips and airborne foreign
materials while working or for local cleanup subsequent to work operations.


AIR BLOWING

Filtered, oil-free compressed air is used in the following applications to clean piping:
Local cleanup of foreign material produced during erection or fabrication
Drying of previously wetted systems




Care must be exercised to direct the air blow and particles away from internal
surfaces of the components being cleaned. Particles must also not be blown
through or at sensitive components.


SOLVENT CLEANING

The following solvents are typically used to clean piping:
Alcohol
Ethyl alcohol (Ethanol)
Methyl alcohol (Methanol) anhydrous
Isopropyl alcohol
Acetone
Toluene which is useful in removing silicone based lubricants
Naphtha
Distilled Petroleum Spirits or Mineral Spirits
For lined piping, solvents used for cleaning must be compatible with the lining
material. When bristle brushes are used in conjunction with solvent cleaning, they
must be non shedding.


WATER BLAST CLEANING

Water blast cleaning or hydrolasing consists of a high pressure , low volume  water jetting of the internal surfaces of the piping system to remove rust, mill scale, oil, and other foreign materials.Radial type spray nozzles that drag the supply hose or push type cleaning nozzles should be used.



When cleaning carbon steel or alloy steel piping, 0.5% to 1% by weight of trisodium
phosphate should be used.

Water quality must be compatible for use on the piping system being cleaned. The water jet must not come in contact with valve seats, flow nozzles, or other sensitive components. After cleaning carbon steel and alloy steel systems, the pipe must be dried by air blowing or other methods.


SYSTEM FLUSHING METHODS


Several methods of system flushing are used to clean piping systems. In general,
the water used for flushing must be compatible with the system being cleaned. After
the completion of the flush, carbon steel and alloy steel systems must be air dried.


Recirculating Flush

This flushing method uses a single batch of water which is recirculated under
pressure through the piping system in a closed path at a prescribed velocity through
strainers, filters, or demineralizers to remove debris and water impurities.


Velocity Flush



A cleaning technique that utilizes the ability of the rapidly flowing liquid or air to scrub, sweep, and scour foreign material from internal walls of the system. Particles picked up in the flush are sent out as waste or trapped and collected on mesh screens or filters. The effective velocity should exceed the design flow rate by two times through the system to perform as desired.


Soaking Method

This process is used when it is not possible to achieve flow by the recirculating method due to the inlet connections or tube shapes for vessels. The disadvantage of this method is that it requires a stronger solution to perform the cleaning and sampling is not as accurate.


Acid Cleaning

This process cleans the internal surfaces of water touched pressure parts to remove
mill scale and rust. The acid solution reacts with iron scale and forms ferric oxide.


Chemical Cleaning

This process uses the circulation of a hot alkaline water or citric acid solution through
the pipe systems to remove oil, grease, fitting lacquers, preservatives, inhibitors, and
possible siliceous materials from carbon steel piping and equipment. The hot 
alkaline water is followed by an acid solution flush to remove iron oxide and mill scale. The acid solution flush liquid is neutralized and flushed out of the piping system.


CLEANING ADDITIVES


Wetting Additives

Wetting agents are used to improve the contact of a cleaning solution with the pipe
and equipment. The additives reduce the surface tension of the cleaning solution
and thereby enhance the cleaning of the metal. Because they are detergent based,
the wetting agents tend to foam which may not be acceptable in all applications.


Anti-Foam Agent

These agents are sometimes used when detergents are added to chemical cleaning
solutions. Their use maintains a low foaming level during cleaning and discharging
of the solution to the waste collection system or tank.


Acid Inhibitors

When added to the cleaning solutions, these inhibitors allow higher cleaning
temperatures and slow the reaction between the cleaning solution and the piping or
equipment base metal.


Chemical Cleaning Set-up

Temporary equipment is usually required to perform any on-site cleaning. A P&ID should be marked up and reviewed showing:
Scope of the cleaning
Desired flow path
All temporary piping and instruments
Heating source for the operation
Strainer and filter locations


All temporary pipe should adhere to the following:

Pipe should be Schedule 40 minimum
Welded joints should be used to prevent leaks
Check gaskets to ensure they are compatible with the heat and chemicals being used
Monitor the system to prevent over pressurization


Temporary Instruments

Make sure temporary glass site gauges installed
Provide differential pressure gauges across strainers to indicate fouling or flow reduction
Install temperature indicators to monitor flushing temperatures


Solution Heating Equipment

There are two methods for heating chemical cleaning solutions.
Direct contact method
Steam supply heat exchanger


Flushing Safety

Safety measures such as warning signs, barriers, or temporary personnel insulation
should be considered. Review all chemical flushing with the Site Safety Representative before starting the flush. .


Chemical Cleaning Set-up

Mechanical cleaning (line-pig) can be used to knock loose dirt and sand particles
and remove oil and grease from the interior piping walls. Filtered well water, plant
water, or city water is normally used for line-pigging of the system. The drums and
coolers required for the cleaning are normally prepared by the vendors prior to the
equipment arriving at the site.
Following the mechanical cleaning and field assembly of required temporary piping,
the acid solution is applied to remove scaling. Whenever possible, agitate the piping
to shake any loose materials free. After the acid cleaning, rinse the system with
fresh water. When using citric acid, a fresh water rinse is not normally performed.
The descaled pipe is then passivated to prevent further corrosion by applying a
phosphate coating. Any of three different solutions are typically used:


Monosodium phosphate
Disodium phosphate
Sodium nitrate

After being passivated, the system is dried using dry nitrogen or filtered, dry
compressed air.
Do not flush the passivated system with water. After drying,
inspect the piping to be sure it is free of rust, mill scale, or other foreign material and
restore and close the system tightly. Blanket the system with inert gas, apply a rust
preventative, or fill the system with oil to minimize rusting in the system. 


Lube Oil Flushing

Prior to any lube oil flushing operation, it is important to check supplier, engineering,
and client requirements for the flushing operation to ensure that the criteria for the
conduct and acceptance of the flush is clearly understood. It is best to have a specific procedure or instruction defining the flushing operation approved by all parties prior to the start of the work. 
The first step in lube oil flushing is to chemically clean and passivate all associated piping, heat exchangers and vessels. 


The following are the normal steps used in a lube oil flush:

Prepare jumpers around seals and bearing housings as close as possible to the
bearings.
Charge the system with the specified oil. The fill amount should give an operating level near that for which the system was designed.
Install 100 mesh screen in the return line to the reservoir.
Circulate the flushing oil for a minimum of hours at the maximum recommended temperature while hammering the piping, switching valves, and cycling bearing and seal oil rundown tanks (if so equipped). 
When clean, remove all temporary jumpers, and reconnect all permanent piping.
Install 100 
mesh screens at the inlet to each bearing. Install blinds in the seal oil
system, if so equipped, so as not to flush through the seals.

Unless otherwise specified by the supplier, continue to circulate the flushing oil in
hour increments until all screens are clean.
When clean, remove temporary jumpers, reconnect all permanent piping,
remove screens, replace filters and clean filter housings. Check pump inlet
screens and clean if needed.
Circulate oil for a minimum of hours.
Discard filters and clean the filter housings. The client may want to see the
discarded screens to verify the adequacy of the lube oil flush.


Plant Steam Start-up

The set-up to perform plant steam starting begins when the system is being placed
in service. Begin with a walkdown of the system looking for any discrepancies,

checking the hydrotesting restoration. The following steps represent one method to
start-up for plant steam and are done with concurrence and direction of Startup
and/or Client representative:
Check gaskets and valve line ups.
Tag-out the system as needed
Open drain valves
Close all steam trap inlets to prevent clogging
Start Boiler and open isolation valves
As the system heats up let the condensate and steam run freely out the open drains. After the condensate has slowed to a steady rate begin opening steam trap branches and closing the drains.
Replace or repair any steam trap not functioning properly.


MAINTAINING CLEANLINESS DURING CONSTRUCTION

The following guidelines should be followed to maintain system cleanliness during
fabrication, installation, and rework operations:
To keep a system clean, start with clean materials. During work operations,
keep the materials in a clean condition.
Apply rust preventatives to the internal surfaces of carbon steel components.
Preventatives must normally be removed prior to turnover.
Keep openings into components sealed when work is not actually in progress.
Perform localized cleanup after completing work operations and prior to reclosing
the system.
Protect clean systems in the vicinity of foreign matter or dirt producing work
operations. This can be done by establishing clean areas and by using internal
dams or external encapsulation when systems are opened.
Establish a foreign object and access control procedures for clean areas.
Immediately remove all visible metal particles or chips after cutting.
Do not use flame cutting in areas where slag may blow into inaccessible
surfaces.
Do not cut pipe in a vertical position if there is a possibility of cutting chips falling
into inaccessible areas.
Clean grinding dust from a ground out area prior to breaking through the wall or
root pass to prevent the dust from entering the clean system.
Use magnetic drill bits to drill holes in carbon or alloy steel pipe to minimize the
entry of metal particles. Frequently clean holes during the drill operation.
Use hole saws when cutting chips cannot be easily removed form internal
surfaces. Holes should be cleaned just prior to breaking through and the plug
should be immediately be removed.
Clean the ends of threaded pipe to remove lubricant and metal chips at the
completion of threading.
Provide an oil-free air blow of all field fabricated piping assemblies, including
valves, to remove loose foreign material.
Seal the openings in completed field fabricated piping assemblies until installed.
Provide desiccant on the inside of the completed pipe assembly if required by the
project specifications.
Prior to fitting or bolting up flanged or other mechanical joints, clean flange faces
of mill varnish or other preservatives.
Cover tack welded pipe joints to prevent the entry of dust until the joint is to be
welded out.

                                                                                                                               

                                                                                                                               


<< READ OTHER INTERESTING POST >>



     DISTILLATION COLUMN PIPING


  
  

       READ MORE >> 



 PIPE RACK PIPING


       READ POST >>



   PIPING SUPPORTS


      

  READ MORE >>



EXPANSION LOOP CALCULATION

   

 READ MORE >>



   CHECKLIST FOR PIPING ISOMETRIC

    READ POST >>



     TYPES OF GASKET


        READ POST >>



Pipe Wall Thickness calculation

    READ MORE >>



    TYPES OF FLANGES

     READ MORE >>


  

TYPES OF STORAGE TANK

     READ POST >>




HEAT EXCHANGER 


 

READ POST >>



 TYPES OF PUMP


READ POST >>


PUMP PIPING





 PIPING MATERIAL


   

        READ MORE >>




           TYPES OF VALVES






           READ MORE >>






    PUMP PIPING




                   


                    



    

          READ MORE >>



 HEAT EXCHANGER







   


 

READ POST >>


 TYPES OF PUMP


READ POST >>



TYPES OF DISTILLATION  COLUMN

READ POST >>



 PDMS & E3D COMMANDS

      READ POST >>




     Caesar II Tutorials            

 READ POST >>




     COMPRESSOR PIPING

    READ MORE >>



     PIPE RACK PIPING


        READ POST >>



    Aveva E3D Tutorials

    READ POST 









            

      UNDERGROUND PIPING


      READ POST >>








































3 comments:

  1. It's a wonderful article. I really enjoyed this article. A lot of important and useful information shared with us. Also, check out underground steam pipe insulation.

    ReplyDelete
  2. Thanks for sharing this great content. It is really informative and useful. Also, check out Expansion Joints Singapore

    ReplyDelete
  3. Thanks for sharing such an amazing blog. It is really helpful for me Pipe Fabrication is, generally speaking, any pipe, fittings and components that are assembled by welding into spool assemblies at the fabricator's facility. Pipe Fabrication Services for Large and Complex Pipe Systems.

    ReplyDelete