1 ADD ALL WITHIN VOL CE 1000 ALL THE COMPONENTS WITH IN THE 1000 DISTANCE ALL AROUND THE CE
2 Q MEM TO QUERY THE MEMBER
3 Q OWN TO QUERY THE OWNER
4 Q U IN /* TO FIND THE ELEVATION OF ORIGIN WITH RESPECT TO WORLD
5 CONN NEXT (Connection to next element)
6 FCONN (For force connection)
7 DIST 500
8 AXES AT PH (To see Axes of Pipe Head)
9 AXES AT PT (To see Axes of Pipe Tail)
10 ROT BY 90 ABOUT Z THRO ID@ (Rotated)
11 Q P1/P2/P3 (To see pipe Bore Direction Connection type and Position)
12 Q HBORE (PIPING)
13 Q TBORE (PIPING)
14 Q LBORE (PIPING)
15 BRA CONN PT TO LAST (PIPING)
16 DIR TOW NEXT (PIPING)
17 MTOC DOTD (Do not want in bill of material) You can see the Doted DOTD
18 MTOC ON (Want in bill of material)
19 MTOC OFF (Don’t Want in bill of material)
20 Q NVOL GIVES THE CE NET VOLUME
21 Q NWEI GIVES THE CE NET WEIGHT
22 Q PH BORE (PIPING)
23 Q PH OD (PIPING)
24 Q PT GIVES THE CE (PIPE TAIL) ATTRIBUTES
25 Q TULE GIVES THE BRANCH TUBE LENGTH
26 ADD ALL WITHIN VOL CE 100 ADDS ALL DISCIPLINES THAT OVERLAP CE WITH A VOLUME
27 AT IDP@ MOVES CE TO SELECT PPOINT
28 Q REF
29 DELETE BRAN Delete Branch
30 Q HSTU To Display Branch Head Side Tube Attributes
31 Q LSTU To Display Component Leave Side Tube Attributes
32 Q ABORE To Display Arrive Bore Of A Component
33 Q LBORE To Display Leave Side Bore Of A Component
34 ADD HREF TREF Add Head & Tail Reference
35 Q HBORE To Display The Head Side Bore Of A Branch
36 Q TBORE To Display The Tail Side Bore Of A Branch
37 Q SPRE To Display The Specification Of The Component
38 Q PSPEC To Display The Specification Of The Pipe
39 NEW ELBO CHOO Create New Elbo
40 NEW ELBO SEL WITH STYP EA To Create The Elbo With Specific Selection Type
41 AXES AT HPOS Axes At Head Possition Of The Branch
42 AXES AT TPOS Axes At Tail Possition Of The Branch
43 NEX TUBI Asking For Tube Being On The Component
44 Q ITLE To Display The Length Of The Tube Between Two Components
45 Q HREF To Display The Head Reference Of A Branch
46 Q TREF To Display The Tail Reference Of A Branch
47 Q DIR To Display The Direction Of The Selected Component
48 CONN PH TO FIR MEM Connect Branch Head To The First Member Of The Branch
49 CONN PT TO LAS MEM Connect The Branch Tail To The Last Member Of The Branch
50 Q ORI To Display The Orientation Of Selected Component
51 CLEA (SPOOL) Giving The Spool Distance Between Two Components
52 Q CATREF To Display The Catalogue Reference At Component Level
53 CONN Connect
54 FCONN Force Connect
55 Q STYP To Display The Component Selection Type
56 FOR To Set The Forward Mode
57 BACK To Set The Backward Mode
58 FIRST MEM To Navigate The First Member
59 LAST MEM To Navigate The Last Member
60 FIRST FLAN To Navigate The First Flange In Hierarchy
61 Q PARA To Display The Parameters
62 Q ACONN To Display The Arrive Connection Detail Of A Component
63 Q LCONN To Display The Leave Connection Details Of A Component
64 DIR TOW NEX Direction Towards The Next Component
65 Q REF To Display Reference
66 INCL Include
67 ORI AND P3 IS UP Orient P3 Of Tee To Up (Specified Direction)
68 OWN Navigate Owner
69 GOTO OWN Go To Owner Of The Selected Component
70 Q ABOP/LBOP Details Of The Arrive/Leave Boptom Of Pipe
71 Q ANGLE Details Of A Angle Of An Elbo
72 Q ATLE Length Of First Tube Of A Branch
73 ATTYPE CCNN Comment Attachment Without Dimension
74 ATTYPE CCCC Comment Attachment With Dimension
75 ATTYPE XXXX Atta For Setting The Isometric Limit
76 CH CE Check Current Element (For Consistency Check)
77 DIR TOW NEXT ELBO Align A Elbo With The Next Elbo
78 DIR TOW ID@ Align The Elbow
79 EXTEND 100 START/END Extend By 100 The Start/End Of A Cross Member
80 Q HCON/TCON Details Of Head/Tail Connection Of A Branch
81 Q HDIR Direction Of The Flow From The Branch Head
82 Q HPOS/TPOS Details Of Head/Tail Possition Of A Branch
83 Q ISPE Insulation Specification
84 ISPEC NULREF For Removing Insulation
85 SPKBRK T For Removing Insulation (Use In Case Fof Atta)
86 MTOC DOTD Mto Component Dotted With Dimension
87 MTOC DOTU Mto Component Dotted With Out Dimension
88 MTOC OFF Mto Component Off
89 NEX CONN Next Connect
90 NEX THRO CE Move The Current Componet To Next
91 ORI AND P3 IS TOW ID@ & DIR TOW ID@ Aligning The 3Rd P-Point Of A Tee Towards Next Elbow
92 Q P3 Details Of P-Point P3 (In Case Of Tee Only)
93 Q PA/P1 Details Of The P-Point 1
94 Q PL Details Of The P-Point 2
95 TCONN OPEN Tail Connection Type Open (Ce Should Be Branch)
96 TDIR Direction Of The Flow From The Branch Tail
97 ISPEC /W To Give The Insulation
98 Q LBORE To Query Leave Bore
99 Q TBORE To Query The Tail Bore
100 THRO PH Through Pipe Head
101 THRO PREV Through Previous
102 THRO PT Through Pipe Tail
103 Q TPOS To Query Tail Position
104 Q HCON To Query The Head Connection
105 Q TCON To Query The Tail Connection
106 Q ACON To Query Arrive Connection
107 Q LCON To Query Leave Connection
108 ATTYPE FLOW To Create Flow Direction Of Attachment
109 DIR N Direction Of Component Towards North
110 BACK CONN Backward Connection